Credits: 2 (0-0-4)
Prerequisites: CVL321
Description
Seepage analysis through an earth dam. Slope stability analysis of a dam. Settlement analysis of shallow and deep foundations; Analysis and design of retaining structures; Analysing the structural forces in a tunnel lining.
Prerequisite Tree
flowchart TD
CVP434-296[CVP434]
CVP434-296 --> CVL321-296[CVL321]
CVL321-296 --> CVL222-296[CVL222]
classDef empty height:17px, fill:transparent, stroke:transparent;
classDef trueEmpty height:0px, width:0px;